Admin مدير المنتدى
عدد المساهمات : 18996 التقييم : 35494 تاريخ التسجيل : 01/07/2009 الدولة : مصر العمل : مدير منتدى هندسة الإنتاج والتصميم الميكانيكى
| موضوع: كتاب Plastic Injection Molding Volume IV الأحد 15 سبتمبر 2019, 3:49 pm | |
|
أخوانى فى الله أحضرت لكم كتاب Plastic Injection Molding Volume IV Fundamentals of Injection Molding series Manufacturing startup and management By Douglas M. Bryce
و المحتوى كما يلي :
Table of Contents Preface xv Chapter 1 – Injection Molding Concepts History . 1 Process Description 1 Categorizing the Parameters . 2 Temperature/Pressure/Time/Distance Horizontal versus Vertical Molding . 19 Advantages of Horizontal Molding/Advantages of Vertical Molding Process Controls 20 Part Quality/Part Cost Parameter Effects . 22 Determining Suitable Parameter Values 23 Setup Sheet Controlling Shrinkage 25 Temperature Adjustment Effects/Pressure Adjustment Effects/Postmold Shrinkage Minimizing Molded-in Stress .30 Summary 31 Questions . 32 Chapter 2 – Materials The Definition of Plastic 35 Polymerization 35 Basic Molecular Structure 35 Copolymers 39 Alloys and Blends 39 Thermoplastics versus Thermosets 40 Amorphous versus Crystalline Structured Materials 41 Amorphous Materials . 41 Crystalline Materials 41 Comparison of Amorphous and Crystalline Molecular Chains . 41 Elastomers 42 How Plastics are Made . 42vi Molecular Weight and Distribution . 44 Influence of Time and Temperature . 44 Summary 44 Questions . 45 Chapter 3 – Determining Primary Equipment Needs Industry Types Served . 47 Plastic Material Families .48 Physical Size of Products 49 Electrical Power Availability 49 Degree of Planned Automation 49 New versus Used Equipment .50 Multiple Screws and Barrels 52 Hydraulic, Toggle, Electric, or Hybrid? . 53 Hydraulic 53 Toggle (Mechanical) .53 Electric .53 Hybrids 54 Estimating Cycle Times . 54 Cooling Time versus Cycle Time 55 Determining Number of Cavities 55 How Much Clamp Tonnage? .57 Summary 59 Questions . 60 Chapter 4 – Determining Auxiliary Equipment Needs What is Considered Auxiliary? . 61 Granulators .61 Dryer Units Overview . 64 Hopper Dryers 64 Floor (Central) Dryers . 64 Oven (Drawer or Tray) Dryers . 67 Defining Dryness . 68 Dew Point Measurement .68 Moisture Testing (TVI Test) . 68 Loaders 70 Mechanical Loaders .70 Vacuum Loaders 70 Positive Pressure Loaders 71vii Blenders . 71 Mold Temperature Controllers 72 Stand-alone Units . 72 Manifold Systems 74 Turbulent versus Laminar Flow . 74 Reynolds Number Determination . 76 Robots . 77 Rigid Robots . 78 Flexible Robots 78 Summary 78 Questions . 79 Chapter 5 – Determining Utility Requirements Defining Utilities 81 Electricity 81 Determining Requirements 81 Molding Machine/Auxiliary Equipment/Chillers/Cooling Towers/Heating, Ventilation, and Air Conditioning (HVAC)/ Air Compressors/Lighting/Maintenance Department/Totals Distribution of Electrical Services . 87 Water Determining Requirements 88 Distribution of Water Services . 89 Compressed Air . 89 Determining Requirements 91 Distribution of Air Services 91 Summary 91 Questions . 92 Chapter 6 – Material Storage and Handling Overview 93 How Much Storage is Required? 93 Height Considerations 94 Silos . 94 Contamination 95 Material Drying . 95 Moisture Levels 95 How to Dry Materials . 96 Measuring Moisture Levels 97viii Summary 97 Questions . 98 Chapter 7 – Tool Room Requirements Minor Repair Facility 99 Major Repair Facility 100 Moldmaking Facility .100 Mold Storage and Handling .101 Causes of Damage 102 Cleaning and Protecting Molds .102 New Molds/Molds in Production Mold Inspection and Installation 105 Storing Molds .111 Short-term Storage/Long-term Storage Machine Maintenance 112 Summary 113 Questions .113 Chapter 8 – Plant Layout Layout Objectives 115 Effective Use of Floor Space 115 Building Plan/Machinery Layout/Manufacturing Cells/ Clean Rooms Optimization of Material Flow 123 Improving Labor Efficiency 123 Planning for Expansion .125 Building Site Criteria 126 Geographic Location Considerations .128 Summary 129 Questions .130 Chapter 9 – Determining Costs Capital Requirements . 131 Building and Land .132 Primary and Auxiliary Equipment 133 Secondary Equipment 134 Depreciation . 135 Tool Room and Maintenance Department 135ix Enclosures 135 Equipment 136 Operating Costs 138 Labor .138 Water .138 Electricity 139 Maintenance . 139 Total Operating Costs . 140 Product Cost Analysis . 140 Determining Machine Hour Rate (MHR) 140 Determining Piece Price 141 Machine Cost/Material Cost/Markups and Profit Margins Projecting Sales Volume 146 Summary 147 Questions .149 References 149 Bibliography . 149 Chapter 10 – Organizational Structure Identifying Needs 151 General Management 153 President 153 Human Resources/Quality Control/Product Engineering/ Manufacturing Engineering/Plant Manager Vice President .158 Finance/Marketing Totals 160 Define Individual and Team Responsibilities 160 Establish Reporting Relationships . 162 Document the Organizational Structure 162 Training Programs 163 Summary 164 Questions .165 Chapter 11 – Quality Control Concepts Quality Program Selection 168 ISO 9000 .168 ISO 14000 . 170 The Quality Manual . 171x Summary 171 Questions .172 Chapter 12 – Effective Management Practices Definition and Requirements 173 Complying with Industry Standards 173 Customer-driven Requirements . 174 Quality and Environmental Issues 175 Welfare of Others 176 Employees/Vendors/Customers Alliances and Partnerships 178 Strategic Alliances .178 Partnerships 179 Effective Communications . 180 Understanding Time Relationships 180 Making Adjustments .181 Providing Motivation 182 Summary 183 Questions .184 Reference .184 Bibliography . 184 Appendix A – Benchmarking an Injection Molding Facility 185 Appendix B – What Customers Look For 187 Answers to Chapter Questions 193 Bibliography . 201 Index 203
كلمة سر فك الضغط : books-world.net The Unzip Password : books-world.net أتمنى أن تستفيدوا من محتوى الموضوع وأن ينال إعجابكم رابط من موقع عالم الكتب لتنزيل كتاب Plastic Injection Molding Volume IV رابط مباشر لتنزيل كتاب Plastic Injection Molding Volume IV
|
|